The record
- A paper record can get lost, soaked, or filled in later than its date suggests
- Nobody can prove with certainty that a record wasn't altered after it was signed
A poorly documented batch isn't a paperwork problem — it's a batch you can't recall from the market in time, or an audit that drags on for weeks because nobody can find the right record. Here's what GMP regulation really requires for traceability, and how to cover it without replacing your ERP.
The regulation
GMP (Good Manufacturing Practice) doesn't mandate a specific tool — it requires traceability to be complete, contemporaneous and tamper-proof. In practice, that shows up again and again in audits as these points:
The problem isn't not knowing this — any quality manager knows it by heart. The problem is sustaining it when traceability is split across spreadsheets, paper and an ERP that wasn't built for this.
The real problem
The record
The movement
The audit
The solution
You don't need to rip out your ERP to fix this — you add the specialised pieces your ERP doesn't cover, integrated with it. Each one is implemented independently, pay-per-use.
Controls the physical movement of the batch in the warehouse: location, quarantine/release and FEFO/FIFO applied automatically, not just a policy on paper.
Learn more →Manages quality results and links them to the batch, with electronic signature compliant with 21 CFR Part 11.
Learn more →Keeps equipment qualification (IQ/OQ/PQ) up to date and connects it to the batches each piece of equipment processed.
Learn more →The result
FAQ
GMP (Good Manufacturing Practice) doesn't mandate a specific tool — it requires traceability to be complete, contemporaneous and tamper-proof.
Because neither enforces rules or leaves a tamper-proof trail: a paper record can be filled in later than its date suggests, and a spreadsheet doesn't stop someone from moving a quarantined batch to available stock by mistake. Reconstructing a batch's history for an audit means cross-checking several files by hand, with the risk that one is missing.
No. You add the specialised pieces your ERP doesn't cover, integrated with it: IP6 WMS controls the physical movement of the batch in the warehouse (location, quarantine/release, FEFO/FIFO), IP6 LIMS manages quality results with electronic signature under 21 CFR Part 11, and DiSQ keeps equipment qualification up to date. Each module is implemented independently, pay-per-use.
FEFO (First Expired, First Out) is the strategy of taking out the batch with the nearest expiry date first, as opposed to FIFO (order of entry). In a regulated warehouse it's the criterion that actually matters: taking out the oldest batch first doesn't prevent one with a closer expiry date from expiring if it arrived later. Enforcing it manually depends on the operator remembering; a WMS applies it automatically.
An audit stops being "search for paperwork" and becomes generating a report with the batch's full history in minutes: what was done, when, by whom, with which equipment and with what quality results — all electronically signed and impossible to alter without leaving a trace.
IP6 Platform
How WMS, LIMS, DiSQ and the rest of the modules fit together.
Learn more →Paperless production, guided step by step to avoid batch errors.
Learn more →How clients like DENTAID, HENKEL or MERCK digitalised their traceability.
Learn more →Let's talk?
Tell us about your situation and we'll suggest where to start — no commitment.
No commitment